Station 2

Station 2 is where team members build the sub floor. The sub floor is constructed.  Additionally, the floor insulation, hot and cold water lines, ABS drain pipes, and decking are installed at this station.

box.jpg box2.jpg

After the floor framing is complete, insulation and water lines are set in place.

Subflooring Your Home

deckingBig.jpg