Station 11

In station 11, the exterior vinyl siding and raised panel shutters are installed. Inside the home, team members check the flooring system for any loose nails and the floor is cleaned before the carpet is installed. Next, the carpet pad is laid and the carpet is cut and installed in each room.

Floor prepared for installation

Carpetbig.jpg

 

Next Station

 

Copyright © 2000-2002 Clayton Homes, Inc.
Legal  Privacy